Data Center Grounding & Bonding Verification

Overview

Grounding and bonding verification for raceways, equipment, shields and conductors, documented before energization.

Grounding and bonding faults are easy to miss and costly to find late. Sitewide verifies grounding and bonding as part of our low-voltage scope, so issues are found and closed before a hall is energized.

What we verify

  • Grounding and bonding of raceways and equipment
  • Shield and conductor bonding
  • Continuity and insulation-resistance testing
  • Phase-rotation and point-to-point testing

Documented, not assumed

Every result is recorded in our live electronic completions platform. Deficiencies become tracked punchlist items and stay visible to the owner until they are closed, through final inspection, turnover and energization.

Crusoe, Data Centers, Abilene, TX
Crusoe

Crusoe, Data Centers, Abilene, TX

Turnkey electrical, instrumentation and mechanical commissioning, 34.5kV terminations and VLF testing.

Read case study
Accreditations

Licensed, audited and compliance-ready

Sitewide is a licensed electrical and instrumentation contractor, registered on the supplier-management platforms owners and EPCs use, with a 2026 EMR of 0.69 and zero OSHA recordables across the active portfolio.

Highwire SafetyTexas Department of Licensing and RegulationDISAComplyWorksISNetworld member contractorLouisiana State Licensing Board for ContractorsAvettaOSHA
FAQs

Yes, for raceways, equipment, shields and conductors, as part of our low-voltage scope.

Continuity, insulation-resistance, phase-rotation and point-to-point testing.

They are logged as punchlist items in our completions platform and tracked to close-out.